Tasks tab inside an object often loads blank until I re-select the view
Description When I open an object and switch to its Tasks tab, the tasks often don't load. The tab stays completely blank, with no tasks and no empty-state message. The tasks only show up after I switch the view and set it back to Kanban (my view for this tab). This happens several times a day and really interrupts my workflow.
Steps to reproduce
Open an object that has tasks linked to it (in my case a object of type project). Switch to the Tasks tab. The tab stays blank. Switch to another view and back to Kanban. The tasks now load normally.
Expected: the tasks load straight away in the Kanban view when I open the tab. Actual: a blank tab until I switch the view manually.
Frequency: intermittent, but several times a day. I haven't found a fixed pattern yet that always triggers it.
Capacities v1.73.8; none none; Mac OS v10.15.7; Chrome v148.0.7778.280 (WebKit v537.36); Desktop (Electron); 23-11-2026, 09:56:14
0 Comments
Sign in to comment
No comments yet. Be the first to share your thoughts!
